Sturgeon Point Shoreline Protection

Stabilize an eroding shoreline over 490 feet, with all proposed work located above the Ordinary High Water Mark. The work will include slope regrading, placement of a concrete toe and rip-rap revetment. The site will be restored with native vegetation after the slope revetment is constructed.
Addendum 01 (click to expand/collapse)
Addendum 02 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
2023_ECWA Sturgeon Point WTP Shoreline_Addendum No 2 599.9 KB